Reducing Physical Risk Factors in Construction Work Through a Participatory Intervention: Protocol for a Mixed-Methods Process Evaluation.
Jeppe Zn AjslevMikkel BrandtJeppe Lykke MøllerSebastian SkalsJonas VinstrupMarkus Due JakobsenEmil SundstrupPascal MadeleineLars Louis AndersenPublished in: JMIR research protocols (2016)
Intervention studies are challenging to conduct and evaluate in the construction industry, often because of narrow time frames and ever-changing contexts. The mixed-methods design presents opportunities for obtaining detailed knowledge of the practices intra-acting with the intervention, while offering the opportunity to customize parts of the intervention.